Victory Schools Office Tenant Improvement Case Study
The Victory Autism Academy project on Camelback Rd in Phoenix was a full gut and remodel that transformed a former dental office into an expanded, connected workspace for their growing team. The project included demolishing the space down to the shell, removing old walls, dental equipment, electrical, and HVAC, replacing non-compliant cast iron pipes, pouring new concrete, and installing metal framing with steel load-bearing beams. The build-out added 11 new private offices, a seamless connection through the dividing wall into their existing adjacent suite, a large service training room, multiple storage closets, 2 new bathrooms, and a breakroom with semi-custom cabinets, a sink, and a new fridge. The space was completed with all-new electrical and HVAC systems, Luxury Vinyl Plank flooring, new baseboards, and fresh interior paint throughout.
Project Overview
The Project: Full gut and remodel to add 11 new private offices, connecting a newly purchased corner suite to their existing adjacent office.
Demolition & Structural Prep
• Complete gut of a former dental office down to the shell (removed walls, chairs, electrical, and HVAC)
• Replaced non-compliant cast iron pipes and poured new concrete
• Installed metal framing and steel load-bearing beams
The Build-Out
• Framed and finished the 11 new offices
• Cut through the dividing wall to create a seamless transition into their existing suite
• Built 1 large service training room and multiple storage closets
• Added 2 brand-new bathrooms
• Built a breakroom with semi-custom cabinets, sink, and new fridge
Systems & Finishes
• Installed all-new electrical and HVAC systems
• Installed new Luxury Vinyl Plank (LVP) flooring and baseboards
• Fresh interior paint throughout
Planning a School, Therapy Center, or Commercial Office Build-Out?
Let’s build a space that supports your team, your clients, and your next stage of growth.
